§ 16-17. Regulations related to water and sewer utilities. (Revised 7/25/06)  


Latest version.
  • 16-17-1 General.

    (1)

    Water and sanitary sewer hookup is mandatory for new construction in accordance with these section 16-17 regulations, unless the Greene County board of supervisors, in consultation with the Rapidan Service Authority finds that the capacity of the public water and/or sewerage system is inadequate to serve the proposed development.

    (2)

    Water and sewer hookup is mandatory for new construction in accordance with these section 16-17 regulations, if a water distribution or gravity sewer line owned by Greene County/Rapidan Service Authority is within 350 feet of a boundary line of the property to be served or within 350 feet of adjoining property under the same ownership or control as the property to be served.

    (3)

    Water and sewer hookups for new construction shall be in accordance with the respective EDU purchase policies as adopted by the board of supervisors, latest revision.

    16-17-2 Water utilities.

    (1)

    Water hookup is mandatory for new construction in the following districts: B1, B2, B3, M1, M2, PUD, SR.

    16-17-3 Sewer utilities.

    (1)

    Sanitary sewer hookup is mandatory for new construction for all zoning districts. (State law reference—Code of Virginia, § 15.2-2121)

    (Ord. of 6-12-18 )

(Ord. of 6-12-18 )